EPD-IES-0035915:001

Bituminous mixtures – Hot mix asphalt type AC

General information

EPD OwnerASFALTER S.A.
Registration numberEPD-IES-0035915:001
EPD typeEPD of multiple products based on the average results of the product group
StatusValid
Version date2026-11-23
Validity date2031-11-22
Standards conformanceISO 14025:2006, EN 15804:2012+A2:2019/AC:2021, ISO 14025:2026
Geographical scopeGreece
An EPD may be updated or depublished if conditions change. This is the latest version of the EPD.

Programme information

ProgrammeInternational EPD System
AddressEPD International AB Box 210 60 SE-100 31 Stockholm Sweden
Websitewww.environdec.com
E-mailsupport@environdec.com

Product category rules

CEN standard EN 15804 serves as the Core Product Category Rules (PCR)
Product Category Rules (PCR)2019:14 Construction products (EN 15804+A2) (version 2.0.1) 2.0.1
PCR review was conducted byThe Technical Committee of the International EPD System. See www.environdec.com for a list of members. Review chair: Rob Rouwette (chair), Noa Meron (co-chair). The review panel may be contacted via the Secretariat www.environdec.com/support.

Verification

Independent third-party verification of the declaration and data, according to ISO 14025:2006, via
Third-party verifierBusiness Quality Verification P.C.
Accredited byHellenic Accreditation System ESYD
Accredited certification body addressGreece
Procedure for follow-up of data during EPD validity involves third party verifier
*EPD Process Certification involves an accredited certification body certifying and periodically auditing the EPD process and conducting external and independent verification of EPDs that are regularly published. More information can be found in the General Programme Instructions on www.environdec.com.

Ownership and limitation on use of EPD

Limitations

EPDs within the same product category but published in different EPD programmes, may not be comparable. For two EPDs to be comparable, they shall be based on the same PCR (including the same first-digit version number) or be based on fully aligned PCRs or versions of PCRs; cover products with identical functions, technical performances and use (e.g. identical declared/functional units); have identical scope in terms of included life-cycle stages (unless the excluded life-cycle stage is demonstrated to be insignificant); apply identical impact assessment methods (including the same version of characterisation factors); and be valid at the time of comparison.

Ownership

The EPD Owner has the sole ownership, liability, and responsibility for the EPD.

Information about EPD Owner

EPD OwnerASFALTER S.A.
Contact person nameGeorge Papageorgiou
Contact person e-mailinfo@asfalter.gr
Organisation address116 Protesilaou Str 13123 Ilion, Attica Greece
LCA PractitionerGEOFASMA TECHNICAL CONSULTING L.P., info@geofasma.gr

Description of the organisation of the EPD Owner

ASFALTER S.A. is a Greek company established in 1984, operating in the production and trading of asphalt concrete and bituminous emulsions, as well as in private road paving projects. The company operates modern production facilities in the Industrial Area of Aspropyrgos, Attica, equipped with an asphalt mixing plant, a quality control laboratory and specialised machinery. Its products are CE-marked, and the company maintains certified management systems in accordance with ISO 9001, ISO 14001 and ISO 45001.

Organisation images

Organisation logo

Product information

Hot Mix Asphalt AC 10

Product nameHot Mix Asphalt AC 10
Product identificationAsphalt Concrete – AC 10 BINDER 50/70, in accordance with EN 13108-1:2006/AC:2008. The product is covered by the Factory Production Control Certificate No. 1128-CPR-1373.
Product descriptionAC 10 BINDER 50/70 is a hot mix asphalt concrete consisting of mineral aggregates of different size fractions, including sand and crushed aggregates, and paving-grade bitumen with penetration grade 50/70. The composition is defined according to the approved mix design and the requirements of EN 13108-1:2006/AC:2008.
Technical purpose of productHot mix asphalt concrete for road construction, intended for use in binder layers.
Manufacturing or service provision descriptionThe asphalt mixture is manufactured at the asphalt production plant of ASFALTER S.A. Mineral aggregates of different fractions are stored separately, proportioned according to the approved mix design, dried and heated in a rotary drum dryer. The heated aggregates are then mixed with bitumen penetration grade 50/70 in the mixing unit to produce the final hot mix asphalt. Upon completion of production, the hot asphalt mixture is loaded onto trucks and transported directly to the construction site, while maintaining the appropriate temperature required for subsequent paving operations.
Material propertiesVolumetric mass density: 1900 kg/m3
Volumetric mass density:
1900 kg/m3
Manufacturing site ASFALTER S.A. Asphalt Concrete Production Plant – ASFALTER S.A. Prari Moustaki 19300 Aspropyrgos, Attica Greece
UN CPC code3794. Bituminous mixtures based on natural and artificial stone materials and bitumen, natural asphalt or related substances as a binder
Geographical scopeGreece

Product images

Hot Mix Asphalt AC 12.5

Product nameHot Mix Asphalt AC 12.5
Product identificationAsphalt Concrete – AC 12.5 SURFACE-BINDER 50/70, in accordance with EN 13108-1:2006/AC:2008. The product is covered by the Factory Production Control Certificate No. 1128-CPR-1373.
Product descriptionAC 12.5 SURFACE-BINDER 50/70 is a hot mix asphalt concrete consisting of mineral aggregates of different size fractions, including sand, crushed aggregates and gravel, and paving-grade bitumen with penetration grade 50/70. The composition is defined according to the approved mix design and the requirements of EN 13108-1:2006/AC:2008.
Technical purpose of productHot mix asphalt concrete for road construction, intended for use in surface and binder layers.
Manufacturing or service provision descriptionThe asphalt mixture is manufactured at the asphalt production plant of ASFALTER S.A. Mineral aggregates of different fractions are stored separately, proportioned according to the approved mix design, dried and heated in a rotary drum dryer. The heated aggregates are then mixed with paving-grade bitumen with a penetration grade of 50/70 in the mixing unit to produce the final hot mix asphalt. Upon completion of production, the hot asphalt mixture is loaded onto trucks and transported directly to the construction site, while maintaining the appropriate temperature required for subsequent paving operations.
Material propertiesVolumetric mass density: 1900 kg/m3
Volumetric mass density:
1900 kg/m3
Manufacturing site ASFALTER S.A. Asphalt Concrete Production Plant – ASFALTER S.A. Prari Moustaki 19300 Aspropyrgos, Attica Greece
UN CPC code3794. Bituminous mixtures based on natural and artificial stone materials and bitumen, natural asphalt or related substances as a binder
Geographical scopeGreece

Product images

Hot Mix Asphalt AC 20

Product nameHot Mix Asphalt AC 20
Product identificationAsphalt Concrete – AC 20 SURFACE-BINDER 50/70, in accordance with EN 13108-1:2006/AC:2008. The product is covered by the Factory Production Control Certificate No. 1128-CPR-1373.
Product descriptionAC 20 SURFACE-BINDER 50/70 is a hot mix asphalt concrete consisting of mineral aggregates of different size fractions, including sand, crushed aggregates and gravel, and paving-grade bitumen with penetration grade 50/70. The composition is defined according to the approved mix design and the requirements of EN 13108-1:2006/AC:2008.
Technical purpose of productHot mix asphalt concrete for road construction, intended for use in surface and binder layers.
Manufacturing or service provision descriptionThe asphalt mixture is manufactured at the asphalt production plant of ASFALTER S.A. Mineral aggregates of different fractions are stored separately, proportioned according to the approved mix design, dried and heated in a rotary drum dryer. The heated aggregates are then mixed with paving-grade bitumen with a penetration grade of 50/70 in the mixing unit to produce the final hot mix asphalt. Upon completion of production, the hot asphalt mixture is loaded onto trucks and transported directly to the construction site, while maintaining the appropriate temperature required for subsequent paving operations.
Material propertiesVolumetric mass density: 1900 kg/m3
Volumetric mass density:
1900 kg/m3
Manufacturing site ASFALTER S.A. Asphalt Concrete Production Plant – ASFALTER S.A. Prari Moustaki 19300 Aspropyrgos, Attica Greece
UN CPC code3794. Bituminous mixtures based on natural and artificial stone materials and bitumen, natural asphalt or related substances as a binder
Geographical scopeGreece

Product images

Hot Mix Asphalt AC 31.5

Product nameHot Mix Asphalt AC 31.5
Product identificationAsphalt Concrete – AC 31.5 BINDER-BASE 50/70, in accordance with EN 13108-1:2006/AC:2008. The product is covered by the Factory Production Control Certificate No. 1128-CPR-1373.
Product descriptionAC 31.5 BINDER-BASE 50/70 is a hot mix asphalt concrete consisting of mineral aggregates of different size fractions, including sand, crushed aggregates and gravel, and paving-grade bitumen with penetration grade 50/70. The composition is defined according to the approved mix design and the requirements of EN 13108-1:2006/AC:2008.
Technical purpose of productHot mix asphalt concrete for road construction, intended for use in binder and base layers.
Manufacturing or service provision descriptionThe asphalt mixture is manufactured at the asphalt production plant of ASFALTER S.A. Mineral aggregates of different fractions are stored separately, proportioned according to the approved mix design, dried and heated in a rotary drum dryer. The heated aggregates are then mixed with paving-grade bitumen with a penetration grade of 50/70 in the mixing unit to produce the final hot mix asphalt. Upon completion of production, the hot asphalt mixture is loaded onto trucks and transported directly to the construction site, while maintaining the appropriate temperature required for subsequent paving operations.
Material propertiesVolumetric mass density: 1900 kg/m3
Volumetric mass density:
1900 kg/m3
Manufacturing site ASFALTER S.A. Asphalt Concrete Production Plant – ASFALTER S.A. Prari Moustaki 19300 Aspropyrgos, Attica Greece
UN CPC code3794. Bituminous mixtures based on natural and artificial stone materials and bitumen, natural asphalt or related substances as a binder
Geographical scopeGreece

Product images

Hot Mix Asphalt AC 12.5 – Type I

Product nameHot Mix Asphalt AC 12.5 – Type I
Product identificationAsphalt Concrete – SKID-RESISTANT TYPE 1 AC 12.5 SURFACE 50/70, in accordance with EN 13108-1:2006/AC:2008. The product is covered by the Factory Production Control Certificate No. 1128-CPR-1373.
Product descriptionSKID-RESISTANT TYPE 1 AC 12.5 SURFACE 50/70 is a hot mix asphalt concrete consisting of sand, hard aggregates produced from Electric Arc Furnace (EAF) slag, and paving-grade bitumen with a penetration grade of 50/70. The product composition is defined by the approved mix design and complies with the requirements of EN 13108-1:2006/AC:2008.
Technical purpose of productHot mix asphalt concrete for road construction, intended for use in surface layers with skid-resistant properties.
Manufacturing or service provision descriptionThe asphalt mixture is manufactured at the asphalt production plant of ASFALTER S.A. Mineral aggregates, including hard aggregates produced from Electric Arc Furnace (EAF) slag, are stored separately and proportioned according to the approved mix design. The aggregates are dried and heated and subsequently mixed with paving-grade bitumen with a penetration grade of 50/70 in the mixing unit. The finished hot mix asphalt is loaded onto trucks and transported directly to the construction site, while maintaining the appropriate temperature required for subsequent paving operations.
Material propertiesVolumetric mass density: 2025 kg/m3
Volumetric mass density:
2025 kg/m3
Manufacturing site ASFALTER S.A. Asphalt Concrete Production Plant – ASFALTER S.A. Prari Moustaki 19300 Aspropyrgos, Attica Greece
UN CPC code3794. Bituminous mixtures based on natural and artificial stone materials and bitumen, natural asphalt or related substances as a binder
Geographical scopeGreece

Product images

Hot Mix Asphalt AC 12.5 – Type II

Product nameHot Mix Asphalt AC 12.5 – Type II
Product identificationAsphalt Concrete – SKID-RESISTANT TYPE 2 AC 12.5 SURFACE 50/70, in accordance with EN 13108-1:2006/AC:2008. The product is covered by the Factory Production Control Certificate No. 1128-CPR-1373.
Product descriptionHot Mix Asphalt AC 12.5 – Type II is a hot mix asphalt concrete consisting of sand, hard aggregates produced from Electric Arc Furnace (EAF) slag, and paving-grade bitumen with a penetration grade of 50/70. The product composition is defined by the approved mix design and complies with the requirements of EN 13108-1:2006/AC:2008.
Technical purpose of productHot mix asphalt concrete for road construction, intended for use in surface layers with skid-resistant properties.
Manufacturing or service provision descriptionThe asphalt mixture is manufactured at the asphalt production plant of ASFALTER S.A. Mineral aggregates, including hard aggregates produced from Electric Arc Furnace (EAF) slag, are stored separately and proportioned according to the approved mix design. The aggregates are dried and heated and subsequently mixed with paving-grade bitumen with a penetration grade of 50/70 in the mixing unit. The finished hot mix asphalt is loaded onto trucks and transported directly to the construction site, while maintaining the appropriate temperature required for subsequent paving operations.
Material propertiesVolumetric mass density: 2025 kg/m3
Volumetric mass density:
2025 kg/m3
Manufacturing siteASFALTER S.A. Asphalt Concrete Production Plant – ASFALTER S.A. Prari Moustaki 19300 Aspropyrgos, Attica Greece
UN CPC code3794. Bituminous mixtures based on natural and artificial stone materials and bitumen, natural asphalt or related substances as a binder
Geographical scopeGreece

Product images

Polymer Modified Hot Mix Asphalt AC 12.5 – Type I

Product namePolymer Modified Hot Mix Asphalt AC 12.5 – Type I
Product identificationAsphalt Concrete – AC 12.5 SURFACE-BINDER PMB 25/55-70, in accordance with EN 13108-1:2006/AC:2008. The product is covered by the Factory Production Control Certificate No. 1128-CPR-1373.
Product descriptionPolymer Modified Hot Mix Asphalt AC 12.5 – Type I is a hot mix asphalt concrete consisting of sand, hard aggregates produced from Electric Arc Furnace (EAF) slag, and polymer-modified bitumen with a penetration grade of 25/55-70. The product composition is defined by the approved mix design and complies with the requirements of EN 13108-1:2006/AC:2008.
Technical purpose of productHot mix asphalt concrete for road construction, intended for use in surface layers with skid-resistant properties.
Manufacturing or service provision descriptionThe asphalt mixture is manufactured at the asphalt production plant of ASFALTER S.A. Mineral aggregates, including hard aggregates produced from Electric Arc Furnace (EAF) slag, are stored separately and proportioned according to the approved mix design. The aggregates are dried, heated and subsequently mixed with polymer-modified bitumen in the mixing unit. The finished hot mix asphalt is loaded onto trucks and transported directly to the construction site, while maintaining the appropriate temperature required for subsequent paving operations.
Material propertiesVolumetric mass density: 2025 kg/m3
Volumetric mass density:
2025 kg/m3
Manufacturing site ASFALTER S.A. Asphalt Concrete Production Plant – ASFALTER S.A. Prari Moustaki 19300 Aspropyrgos, Attica Greece
UN CPC code3794. Bituminous mixtures based on natural and artificial stone materials and bitumen, natural asphalt or related substances as a binder
Geographical scopeGreece

Product images

ECO Hot Mix Asphalt AC 12.5

Product nameECO Hot Mix Asphalt AC 12.5
Product identificationAsphalt Concrete – AC 12.5 ECO SURFACE-BINDER 50/70, in accordance with EN 13108-1:2006/AC:2008. The product is covered by the Factory Production Control Certificate No. 1128-CPR-1373.
Product descriptionECO Hot Mix Asphalt AC 12.5 is a hot mix asphalt concrete consisting of natural mineral aggregates, recycled aggregates, and paving-grade bitumen with a penetration grade of 50/70. The product composition is defined by the approved mix design and complies with the requirements of EN 13108-1:2006/AC:2008.
Technical purpose of productHot mix asphalt concrete for road construction, intended for use in surface and binder layers.
Manufacturing or service provision descriptionThe asphalt mixture is manufactured at the asphalt production plant of ASFALTER S.A. Natural and recycled mineral aggregates of different fractions, are stored separately and proportioned according to the approved mix design. The aggregates are dried, heated and subsequently mixed with paving-grade bitumen with a penetration grade of 50/70 in the mixing unit. The finished hot mix asphalt is loaded onto trucks and transported directly to the construction site, while maintaining the appropriate temperature required for subsequent paving operations.
Material propertiesVolumetric mass density: 1900 kg/m3
Volumetric mass density:
1900 kg/m3
Manufacturing site ASFALTER S.A. Asphalt Concrete Production Plant – ASFALTER S.A. Prari Moustaki 19300 Aspropyrgos, Attica Greece
UN CPC code3794. Bituminous mixtures based on natural and artificial stone materials and bitumen, natural asphalt or related substances as a binder
Geographical scopeGreece

Product images

ECO Hot Mix Asphalt AC 20

Product nameECO Hot Mix Asphalt AC 20
Product identificationAsphalt Concrete – AC 20 ECO SURFACE-BINDER 50/70, in accordance with EN 13108-1:2006/AC:2008. The product is covered by the Factory Production Control Certificate No. 1128-CPR-1373.
Product descriptionECO Hot Mix Asphalt AC 20 is a hot mix asphalt concrete consisting of mineral aggregates, including recycled aggregates, and paving-grade bitumen with a penetration grade of 50/70. The product composition is defined by the approved mix design and complies with the requirements of EN 13108-1:2006/AC:2008.
Technical purpose of productHot mix asphalt concrete for road construction, intended for use in surface and binder layers.
Manufacturing or service provision descriptionThe asphalt mixture is manufactured at the asphalt production plant of ASFALTER S.A. Natural and recycled mineral aggregates of different fractions, are stored separately and proportioned according to the approved mix design. The aggregates are dried, heated and subsequently mixed with paving-grade bitumen with a penetration grade of 50/70 in the mixing unit. The finished hot mix asphalt is loaded onto trucks and transported directly to the construction site, while maintaining the appropriate temperature required for subsequent paving operations.
Material propertiesVolumetric mass density: 1900 kg/m3
Volumetric mass density:
1900 kg/m3
Manufacturing site ASFALTER S.A. Asphalt Concrete Production Plant – ASFALTER S.A. Prari Moustaki 19300 Aspropyrgos, Attica Greece
UN CPC code3794. Bituminous mixtures based on natural and artificial stone materials and bitumen, natural asphalt or related substances as a binder
Geographical scopeGreece

Product images

ECO Hot Mix Asphalt AC 31.5

Product nameECO Hot Mix Asphalt AC 31.5
Product identificationAsphalt Concrete – AC 31.5 ECO BINDER-BASE 50/70, in accordance with EN 13108-1:2006/AC:2008. The product is covered by the Factory Production Control Certificate No. 1128-CPR-1373.
Product descriptionECO Hot Mix Asphalt AC 31.5 is a hot mix asphalt concrete consisting of mineral aggregates, including recycled aggregates, and paving-grade bitumen with a penetration grade of 50/70. The product composition is defined by the approved mix design and complies with the requirements of EN 13108-1:2006/AC:2008.
Technical purpose of productHot mix asphalt concrete for road construction, intended for use in binder and base layers.
Manufacturing or service provision descriptionThe asphalt mixture is manufactured at the asphalt production plant of ASFALTER S.A. Natural and recycled mineral aggregates of different fractions, are stored separately and proportioned according to the approved mix design. The aggregates are dried, heated and subsequently mixed with paving-grade bitumen with a penetration grade of 50/70 in the mixing unit. The finished hot mix asphalt is loaded onto trucks and transported directly to the construction site, while maintaining the appropriate temperature required for subsequent paving operations.
Material propertiesVolumetric mass density: 1900 kg/m3
Volumetric mass density:
1900 kg/m3
Manufacturing site ASFALTER S.A. Asphalt Concrete Production Plant – ASFALTER S.A. Prari Moustaki 19300 Aspropyrgos, Attica Greece
UN CPC code3794. Bituminous mixtures based on natural and artificial stone materials and bitumen, natural asphalt or related substances as a binder
Geographical scopeGreece

Product images

Polymer Modified Hot Mix Asphalt AC 12.5

Product namePolymer Modified Hot Mix Asphalt AC 12.5
Product identificationAsphalt Concrete – SKID-RESISTANT TYPE 1 SURFACE PMB 25/55-70 (MODIFIED), in accordance with EN 13108-1:2006/AC:2008. The product is covered by the Factory Production Control Certificate No. 1128-CPR-1373.
Product descriptionPolymer Modified Hot Mix Asphalt AC 12.5 is a hot mix asphalt concrete consisting of mineral aggregates and polymer-modified bitumen with a penetration grade of 25/55-70. The product composition is defined by the approved mix design and complies with the requirements of EN 13108-1:2006/AC:2008.
Technical purpose of productHot mix asphalt concrete for road construction, intended for use in surface and binder layers.
Manufacturing or service provision descriptionThe asphalt mixture is manufactured at the asphalt production plant of ASFALTER S.A. Mineral aggregates of different fractions are stored separately, proportioned according to the approved mix design, dried and heated. The heated aggregates are then mixed with polymer-modified bitumen with a penetration grade of 25/55-70 in the mixing unit to produce the final hot mix asphalt. Upon completion of production, the hot asphalt mixture is loaded onto trucks and transported directly to the construction site, while maintaining the appropriate temperature required for subsequent paving operations.
Material propertiesVolumetric mass density: 1900 kg/m3
Volumetric mass density:
1900 kg/m3
Manufacturing site ASFALTER S.A. Asphalt Concrete Production Plant – ASFALTER S.A. Prari Moustaki 19300 Aspropyrgos, Attica Greece
UN CPC code3794. Bituminous mixtures based on natural and artificial stone materials and bitumen, natural asphalt or related substances as a binder
Geographical scopeGreece

Product images

Content declaration

Content declaration of multiple productsThe content declaration represents the average material composition of the asphalt mixtures covered by this EPD. The average composition has been calculated based on the production quantities of each asphalt mixture type manufactured during the reference year 2025. The mass of each constituent material has been weighted according to the respective production volumes (in tonnes), so that the declared content reflects the actual production mix of the manufacturing plant.
Hazardous and toxic substancesThe product does not contain any substances from the SVHC candidate list in concentrations exceeding 0.1% of its weight.
Product content
Content nameMass, kgPost-consumer recycled material, mass-% of productBiogenic material, mass-% of productBiogenic material1, kg C/declared unit
Bitumen / Polymer Modified Bitumen42.9000
Natural Aggregates949000
EAF slag aggregates7000
Reclaimed Asphalt Pavement (RAP)1.10.1100
Total10000.1100
Note 11 kg biogenic carbon is equivalent to 44/12 kg of CO2

LCA information

EPD based on declared or functional unitDeclared unit
Declared unit and reference flowHot Mix Asphalt Concrete Mass: 1000 kg
Conversion factor to mass1
Are infrastructure or capital goods included in any upstream, core or downstream processes?
Datasources used for this EPDecoinvent database (general) ecoinvent 3.12 database
LCA SoftwareOpenLCA 2.6.1
Version of the EN 15804 reference packageEF Reference Package 3.1
Characterisation methodsThe characterisation method applied in the life cycle impact assessment LCIA) is the Environmental Footprint EF) method, version 3.1.
Technology description including background systemThe products covered by this EPD comprise various types of hot mix asphalt concrete, including conventional asphalt mixtures, ECO asphalt mixtures incorporating recycled aggregates, skid-resistant asphalt mixtures incorporating hard aggregates produced from Electric Arc Furnace (EAF) slag, and polymer-modified bitumen (PMB) asphalt mixtures. The mixtures differ in their nominal aggregate size, aggregate composition and bitumen grade, according to their respective approved mix designs. The main raw materials include natural mineral aggregates, recycled aggregates and/or EAF slag aggregates, as applicable, and paving-grade bitumen (penetration grade 50/70 or polymer-modified bitumen). The manufacturing process includes the separation and proportioning of aggregate fractions, drying and heating in a rotary drum dryer, and mixing with bitumen to produce the final asphalt mixture. Following production, the hot mix asphalt is loaded directly onto transport vehicles and dispatched to the construction site, without intermediate storage at the manufacturing plant. The background system includes the upstream production and supply of raw materials, fuels and electricity, as well as the relevant transport processes. The LCA system boundary covers the product stage (modules A1–A3), including raw material supply, transport to the manufacturing plant and manufacturing of the asphalt mixtures.
Scrap (recycled material) inputs contribution levelLess than 10% of the GWP-GHG results in modules A1-A3 come from scrap inputs

Data quality assessment

Description of data quality assessment and reference yearsThe data quality assessment was carried out in accordance with EN 15941 and the requirements of PCR 2019:14, taking into account the relevance and representativeness of the data used in the LCA. The study combines production and operational data provided by ASFALTER S.A. for the reference year 2025 with environmental data from suppliers' EPDs, where available, and background datasets from ecoinvent v3.12. These sources were used to model the main raw materials and processes involved in asphalt mixture production, including bitumen, aggregates, EAF slag, reclaimed asphalt (RAP), transportation, and the consumption of heavy fuel oil (mazut), diesel and electricity. The reference years and data categories are reported in the data quality assessment table. The main contributing processes to the GWP-GHG results for modules A1–A3 were also considered in the assessment.
Data quality assessment
Process nameSource typeSourceReference yearData categoryShare of primary data, of GWP-GHG results for A1-A3
Production of bitumenDatabaseEcoinvent v3.122025Secondary data0%
Transportation of raw materialsDatabaseEcoinvent v3.122025Primarydata5.57%
Generation of electricity used in manufacturing of productDatabaseEcoinvent v3.122025Primary data5.04%
Production of aggregates (coarse aggregates)EPDEPD-IES-00244732024Specific data0%
Production of EAF slag aggregatesEPDEPD S-P-041812021Specific data0%
Other processesDatabaseEcoinvent v3.122025Secondary data0%
Total share of primary data, of GWP-GHG results for A1-A310.61%
The share of primary data is calculated based on GWP-GHG results. It is a simplified indicator for data quality that supports the use of more primary data to increase the representativeness of and comparability between EPDs. Note that the indicator does not capture all relevant aspects of data quality and is not comparable across product categories.
Electricity data
Electricity used in the manufacturing process in A3 (A5 for services)
Type of electricity mixResidual electricity mix on the market
Energy sourcesHydro1.19%
Wind17.44%
Solar17.56%
Biomass1.33%
Geothermal0.01%
Waste0%
Nuclear0.04%
Natural gas44.84%
Coal5.75%
Oil7.37%
Peat0%
Other4.47%
GWP-GHG intensity (kg CO2 eq./kWh)0.54 kg CO2 eq./kWh
Electricity data
Electricity used in On-site photovoltaic electricity
Type of electricity mixSpecific electricity mix as generated, or purchased from an electricity supplier, demonstrated by a contractual instrument
Energy sourcesHydro0%
Wind0%
Solar100%
Biomass0%
Geothermal0%
Waste0%
Nuclear0%
Natural gas0%
Coal0%
Oil0%
Peat0%
Other0%
GWP-GHG intensity (kg CO2 eq./kWh)0.08 kg CO2 eq./kWh

System boundary

Description of the system boundarya) Cradle to gate with modules C1-C4 and module D (A1-A3 + C + D).
Excluded modulesNo, there is no excluded module, or there are no excluded modules

Declared modules

Product stageConstruction process stageUse stageEnd of life stageBeyond product life cycle
Raw material supplyTransportManufacturingTransport to siteConstruction installationUseMaintenanceRepairReplacementRefurbishmentOperational energy useOperational water useDe-construction demolitionTransportWaste processingDisposalReuse-Recovery-Recycling-potential
ModuleA1A2A3A4A5B1B2B3B4B5B6B7C1C2C3C4D
Modules declaredXXXNDNDNDNDNDNDNDNDNDXXXXX
GeographyGreeceGreeceGreeceN/AN/AN/AN/AN/AN/AN/AN/AN/AGreeceGreeceGreeceGreeceGreece
Share of specific data10.61%--------------
Variation - products55.02%--------------
Variation - sites0%--------------
DisclaimerThe share of specific/primary data and both variations (products and sites) refer to GWP-GHG results only.

Process flow diagram(s) related images

Default scenario

Name of the default scenarioEnd-of-life scenario for hot mix asphalt
Description of the default scenarioIn the absence of Greece-specific statistical data on the end-of-life management of reclaimed asphalt, the scenario is based on the European Asphalt Pavement Association (EAPA) publication Asphalt in Figures 2024. According to the aggregated data reported by the participating countries, 73% of the available reclaimed asphalt is re-used in new asphalt mixtures, while 24% is recycled in other applications. The remaining 3% is reported under the combined category of landfill, other applications or unknown destinations. For the purposes of this LCA study, it is conservatively assumed that the entire remaining 3% is disposed of in landfill and is therefore modelled in module C4. This assumption is made to enable the definition of a complete end-of-life scenario and does not represent a verified landfill rate for Greece.

Module C: End-of-life

Explanatory name of the default scenario in module CAsphalt Mixture EoL
Brief description of the default scenario in module CMilling, transport, reuse, recycling and landfill of reclaimed asphalt
Description of the default scenario in module CAt the end of its service life, the asphalt pavement is assumed to be removed by cold milling. The reclaimed asphalt is transported 80 km by lorry to a recovery or disposal facility. It is assumed that 73% is reused in new asphalt mixtures, 24% is recycled in other construction applications and 3% is landfilled.
Module C informationValueUnit
Collection process, collected separately1000
kg
Collection process, collected with mixed construction waste0
kg
Recovery system, for re-use730
kg
Recovery system, for recycling240
kg
Recovery system, for energy recovery0
kg
Disposal, for final deposition30
kg
Waste transport, distance80
km
Vehicle type 16–32 metric tonne lorry, EURO 5

Module D: Beyond product life cycle

Explanatory name of the default scenario in module DRAP Material Recovery
Brief description of the default scenario in module DAvoided production of primary aggregates and bitumen through RAP recovery
Description of the default scenario in module DAt the end of its service life, the reclaimed asphalt pavement (RAP) is assumed to undergo processing until it reaches the end-of-waste status. The recovered material is then directed to two recovery routes, in accordance with the selected end-of-life scenario. The fraction intended for re-use in new hot mix asphalt is assumed to substitute primary mineral aggregates and virgin bitumen. The substitution quantities are estimated using substitution rates derived from comparisons of the company's conventional and ECO asphalt mix designs. The fraction intended for recycling in other construction applications is assumed to substitute primary crushed aggregates. Module D accounts for the potential environmental benefits associated with avoiding the production of these substituted primary materials. The calculation considers the net recovered material flows, after deducting recovered material entering the product system in modules A1–A3. No material recovery or substitution benefit is assumed for the fraction sent to landfill.

Additional scenario 1

Name of the additional scenario100% Recycling
Description of the additional scenarioThis scenario assumes that 100% of the asphalt pavement at the end of its service life is sent for recycling in other construction applications.

Module C: End-of-life

Description of the additional scenario in module CAt the end of its service life, the asphalt pavement is assumed to be removed by cold milling and transported 80 km by lorry to a recovery facility. The entire quantity is assumed to undergo processing at an authorised construction and demolition waste treatment facility and to be recycled for use in other construction applications.
Module C informationValueUnit
Collected separately1000
kg
Collection process, collected with mixed construction waste0
kg
Recovery system, for re-use0
kg
Recovery system, for recycling1000
kg
Recovery system, for energy recovery0
kg
Disposal, for final deposition0
kg
Waste transport, distance80
km
Vehicle type 16–32 metric tonne lorry, EURO 5

Module D: Beyond product life cycle

Description of the additional scenario in module DThe recovered asphalt material obtained from recycling is assumed to substitute primary crushed aggregates used in other construction applications. The avoided production of virgin aggregates is accounted for as an environmental benefit in Module D.

Additional scenario 2

Name of the additional scenario100% Re-Use
Description of the additional scenarioThis scenario assumes that 100% of the asphalt pavement at the end of its service life is sent for reuse in new asphalt mixtures.

Module C: End-of-life

Description of the additional scenario in module CAt the end of its service life, the asphalt pavement is removed by cold milling and transported 80 km by lorry to a recovery facility. The entire quantity is assumed to undergo processing at an authorised construction and demolition waste treatment facility and to be reused in new asphalt mixtures.
Module C informationValueUnit
Collected separately1000
kg
Collected with mixed construction waste0
kg
Recovery system, for re-use1000
kg
Recovery system, for recycling0
kg
Recovery system, for energy recovery0
kg
Disposal, for final deposition0
kg
Waste transport, distance80
km
Vehicle type 16–32 metric tonne lorry, EURO 5

Module D: Beyond product life cycle

Description of the additional scenario in module DThe recovered asphalt material (RAP) is assumed to be reused in the production of new asphalt mixtures, reducing the need for virgin raw materials. The environmental benefits are calculated based on the avoided production of primary mineral aggregates and virgin bitumen, using substitution rates derived from comparisons of the company's conventional and ECO asphalt mix designs.

Additional scenario 3

Name of the additional scenario100% Landfilling
Description of the additional scenarioThis scenario assumes that 100% of the asphalt pavement at the end of its service life is sent for final disposal in a landfill.

Module C: End-of-life

Description of the additional scenario in module CAt the end of its service life, the asphalt pavement is assumed to be removed by cold milling and transported 80 km by lorry to a landfill facility. The entire quantity is assumed to be disposed of in a landfill, with no reuse or recycling.
Module C informationValueUnit
Collected seperately1000
kg
Collection process, collected with mixed construction waste0
kg
Recovery system, for re-use0
kg
Recovery system, for recycling0
kg
Recovery system, for energy recovery0
kg
Disposal, for final deposition1000
kg
Waste transport, distance80
km
Vehicle type 16–32 metric tonne lorry, EURO 5

Module D: Beyond product life cycle

Description of the additional scenario in module DNo material recovery or substitution of primary raw materials is assumed in this scenario. Therefore, no environmental benefits or avoided burdens are declared in Module D.

Environmental performance

The estimated impact results are only relative statements, which do not indicate the endpoints of the impact categories, exceeding threshold values, safety margins and/or risks.

Mandatory environmental performance indicators according to EN 15804

Impact categoryIndicatorUnitA1-A3A4A5B1B2B3B4B5B6B7C1C2C3C4DVariation2
Climate change - totalGWP-totalkg CO2 eq.4.65E+1NDNDNDNDNDNDNDNDND3.99E-11.52E+12.07E+05.20E-1-2.64E+171.04%
Climate change - fossilGWP-fossilkg CO2 eq.4.65E+1NDNDNDNDNDNDNDNDND3.99E-11.52E+12.07E+05.19E-1-3.01E-271.04%
Climate change - biogenicGWP-biogenickg CO2 eq.1.27E-2NDNDNDNDNDNDNDNDND4.34E-53.09E-39.14E-59.30E-4-1.50E-260.25%
Climate change - land use and land-use changeGWP-luluckg CO2 eq.9.85E-3NDNDNDNDNDNDNDNDND4.03E-54.91E-32.13E-42.10E-4-1.13E-690.01%
Ozone depletionODPkg CFC-11 eq.4.26E-6NDNDNDNDNDNDNDNDND6.13E-93.44E-78.94E-89.18E-9-1.38E-134.35%
AcidificationAPmol H+ eq.1.88E-1NDNDNDNDNDNDNDNDND3.56E-34.78E-21.19E-22.52E-3-4.68E-361.09%
Eutrophication aquatic freshwaterEP-freshwaterkg P eq.3.77E-3NDNDNDNDNDNDNDNDND1.28E-51.06E-35.98E-43.60E-5-3.75E-259.38%
Eutrophication aquatic marineEP-marinekg N eq.4.32E-2NDNDNDNDNDNDNDNDND1.67E-31.67E-24.57E-33.60E-3-4.21E-175.50%
Eutrophication terrestrialEP-terrestrialmol N eq.4.55E-1NDNDNDNDNDNDNDNDND1.82E-21.81E-14.86E-21.05E-2-1.95E-176.79%
Photochemical ozone formationPOCPkg NMVOC eq.4.26E-1NDNDNDNDNDNDNDNDND5.47E-37.56E-21.52E-23.67E-3-9.58E-550.71%
Depletion of abiotic resources - minerals and metalsADP-minerals&metals1kg Sb eq.4.17E-5NDNDNDNDNDNDNDNDND1.48E-75.30E-59.10E-76.63E-7-7.74E+2133.29%
Depletion of abiotic resources - fossil fuelsADP-fossil1MJ, net calorific value2.43E+3NDNDNDNDNDNDNDNDND5.17E+02.15E+22.84E+17.58E+0-1.58E+136.23%
Water useWDP1m3 world eq. deprived2.92E+1NDNDNDNDNDNDNDNDND1.30E-21.12E+01.06E-13.25E-1-1.53E+154.34%
AcronymsGWP-fossil = Global Warming Potential fossil fuels; GWP-biogenic = Global Warming Potential biogenic; GWP-luluc = Global Warming Potential land use and land use change; ODP = Depletion potential of the stratospheric ozone layer; AP = Acidification potential, Accumulated Exceedance; EP-freshwater = Eutrophication potential, fraction of nutrients reaching freshwater end compartment; EP-marine = Eutrophication potential, fraction of nutrients reaching marine end compartment; EP-terrestrial = Eutrophication potential, Accumulated Exceedance; POCP = Formation potential of tropospheric ozone; ADP-minerals&metals = Abiotic depletion potential for non-fossil resources; ADP-fossil = Abiotic depletion for fossil resources potential; WDP = Water (user) deprivation potential, deprivation-weighted water consumption
General disclaimerThe results of the end-of-life stage (modules C1-C4) should be considered when using the results of the product stage (modules A1-A3/A1-A5 for services).
Disclaimer 1The results of this environmental impact indicator shall be used with care as the uncertainties of these results are high or as there is limited experience with the indicator
Disclaimer 2The maximum variation in results between the included products for modules A-C.

Additional mandatory environmental performance indicators

Impact categoryIndicatorUnitA1-A3A4A5B1B2B3B4B5B6B7C1C2C3C4D
Climate change - GWP-GHGGWP-GHG1kg CO2 eq.4.65E+1NDNDNDNDNDNDNDNDND3.99E-11.52E+12.07E+05.20E-1-2.65E+1
AcronymsGWP-GHG = Global warming potential greenhouse gas.
General disclaimerThe results of the end-of-life stage (modules C1-C4) should be considered when using the results of the product stage (modules A1-A3/A1-A5 for services).
Disclaimer 1The GWP-GHG indicator is termed GWP-IOBC/GHG in the ILCD+EPD+ data format. The indicator accounts for all greenhouse gases except biogenic carbon dioxide uptake and emissions and biogenic carbon stored in the product. As such, the indicator is identical to GWP-total except that the CF for biogenic CO2 is set to zero.

Additional voluntary environmental performance indicators according to EN 15804

Impact categoryIndicatorUnitA1-A3A4A5B1B2B3B4B5B6B7C1C2C3C4D
Particulate matter emissionsPMDisease incidence2.26E-6NDNDNDNDNDNDNDNDND1.02E-71.22E-62.66E-75.80E-8-1.15E+0
Ionizing radiation - human healthIRP1kBq U235 eq.6.73E-1NDNDNDNDNDNDNDNDND2.16E-32.46E-19.52E-35.87E-3-8.26E+1
Eco-toxicity - freshwaterETP-fw2CTUe1.22E+2NDNDNDNDNDNDNDNDND5.25E-13.18E+12.72E+01.26E+0-7.20E-9
Human toxicity - cancer effectsHTP-c2CTUh1.12E-8NDNDNDNDNDNDNDNDND3.83E-112.49E-92.75E-106.92E-11-1.91E-7
Human toxicity - non-cancer effectsHTP-nc2CTUh2.83E-7NDNDNDNDNDNDNDNDND6.82E-101.31E-76.91E-91.82E-9-2.02E+2
Land-use related impacts/soil qualitySQP2Dimensionless1.61E+2NDNDNDNDNDNDNDNDND3.58E-11.28E+29.78E+01.74E+1-2.02E+2
AcronymsPM = Potential incidence of disease due to particulate matter emissions; IRP = Potential human exposure efficiency relative to U235; ETP-fw = Potential comparative toxic unit for ecosystems; HTP-c = Potential comparative toxic unit for humans; HTP-nc = Potential comparative toxic unit for humans; SQP = Potential soil quality index.
General disclaimerThe results of the end-of-life stage (modules C1-C4) should be considered when using the results of the product stage (modules A1-A3/A1-A5 for services).
Disclaimer 1This impact category deals mainly with the eventual impact of low dose ionizing radiation on human health of the nuclear fuel cycle. It does not consider effects due to possible nuclear accidents, occupational exposure nor due to radioactive waste disposal in underground facilities. Potential ionizing radiation from the soil, from radon and from some construction materials is also not measured by this indicator.
Disclaimer 2The results of this environmental impact indicator shall be used with care as the uncertainties of these results are high or as there is limited experience with the indicator.

Resource use indicators according to EN 15804

IndicatorUnitA1-A3A4A5B1B2B3B4B5B6B7C1C2C3C4D
PEREMJ, net calorific value1.63E+1NDNDNDNDNDNDNDNDND3.24E-23.54E+03.63E+01.00E-10.00E+0
PERMMJ, net calorific value1.82E-4NDNDNDNDNDNDNDNDND0.00E+00.00E+00.00E+00.00E+0-1.53E+1
PERTMJ, net calorific value1.63E+1NDNDNDNDNDNDNDNDND3.24E-23.54E+03.63E+01.00E-1-7.74E+2
PENREMJ, net calorific value2.43E+3NDNDNDNDNDNDNDNDND5.17E+02.15E+22.84E+17.58E+00.00E+0
PENRMMJ, net calorific value1.82E-4NDNDNDNDNDNDNDNDND0.00E+00.00E+00.00E+00.00E+0-7.74E+2
PENRTMJ, net calorific value2.43E+3NDNDNDNDNDNDNDNDND5.17E+02.15E+22.84E+17.58E+0-5.53E-1
SMkg4.85E-1NDNDNDNDNDNDNDNDND2.94E-32.08E-11.16E-25.10E-3-1.49E-1
RSFMJ, net calorific value1.27E-1NDNDNDNDNDNDNDNDND2.99E-44.87E-21.81E-36.98E-40.00E+0
NRSFMJ, net calorific value4.91E-4NDNDNDNDNDNDNDNDND0.00E+00.00E+00.00E+00.00E+0-3.62E-1
FWm36.68E-1NDNDNDNDNDNDNDNDND3.11E-42.54E-22.37E-3-1.11E-1-3.78E+0
AcronymsPERE = Use of renewable primary energy excluding renewable primary energy resources used as raw materials; PERM = Use of renewable primary energy resources used as raw materials; PERT = Total use of renewable primary energy resources; PENRE = Use of non-renewable primary energy excluding non-renewable primary energy resources used as raw materials; PENRM = Use of non-renewable primary energy resources used as raw materials; PENRT = Total use of non-renewable primary energy re-sources; SM = Use of secondary material; RSF = Use of renewable secondary fuels; NRSF = Use of non-renewable secondary fuels; FW = Use of net fresh water.
General disclaimerThe results of the end-of-life stage (modules C1-C4) should be considered when using the results of the product stage (modules A1-A3/A1-A5 for services).

Waste indicators according to EN 15804

IndicatorUnitA1-A3A4A5B1B2B3B4B5B6B7C1C2C3C4D
HWDkg2.23E+0NDNDNDNDNDNDNDNDND1.68E-21.31E+06.71E-23.90E-2-3.30E+1
NHWDkg2.30E+1NDNDNDNDNDNDNDNDND8.38E-21.73E+13.06E+07.96E+1-2.75E-4
RWDkg1.54E-4NDNDNDNDNDNDNDNDND5.08E-75.94E-52.20E-61.40E-60.00E+0
AcronymsHWD = Hazardous waste disposed; NHWD = Non-hazardous waste disposed; RWD = Radioactive waste disposed.
General disclaimerThe results of the end-of-life stage (modules C1-C4) should be considered when using the results of the product stage (modules A1-A3/A1-A5 for services).

Output flow indicators according to EN 15804

IndicatorUnitA1-A3A4A5B1B2B3B4B5B6B7C1C2C3C4D
CRUkg0.00E+0NDNDNDNDNDNDNDNDND0.00E+00.00E+00.00E+00.00E+00.00E+0
MFRkg4.55E-1NDNDNDNDNDNDNDNDND2.50E-31.92E-11.09E-23.69E-3-1.37E-1
MERkg0.00E+0NDNDNDNDNDNDNDNDND0.00E+00.00E+00.00E+00.00E+0-4.83E-1
EEEMJ, net calorific value9.55E-2NDNDNDNDNDNDNDNDND2.41E-43.98E-21.17E-32.11E-3-3.83E-2
EETMJ, net calorific value4.58E-2NDNDNDNDNDNDNDNDND1.15E-45.04E-28.03E-48.67E-4-1.99E-6
AcronymsCRU = Components for re-use; MFR = Materials for recycling; MER = Materials for energy recovery; EEE = Exported electrical energy; EET = Exported thermal energy.
General disclaimerThe results of the end-of-life stage (modules C1-C4) should be considered when using the results of the product stage (modules A1-A3/A1-A5 for services).

Results for additional scenarios for modules A4-C4

Additional scenario100% Recycling
Description of the scenario/methodThe additional scenario assumes that 100% of the asphalt pavement is directed to recycling in other construction applications, instead of the mixed end-of-life distribution considered in the main scenario (73% reuse, 24% recycling and 3% landfill). The environmental results are calculated accordingly, considering the same collection, transport and recycling processes as described for the main scenario.
Results for additional scenarios for modules A4-C4
Impact categoryIndicatorUnitA1-A3A4A5B1B2B3B4B5B6B7C1C2C3C4D
Global warming potential - total(GWP-total)kg CO2 eq.4.65E+1NDNDNDNDNDNDNDNDND3.99E-11.52E+12.13E+00.00E+0-1.77E+1
Global warming potential - fossil fuels(GWP-fossil)kg CO2 eq.4.65E+1NDNDNDNDNDNDNDNDND3.99E-11.52E+12.13E+00.00E+0-2.32E-2
Global warming potential - biogenic(GWP-biogenic)kg CO2 eq.1.27E-2NDNDNDNDNDNDNDNDND4.34E-53.09E-39.42E-50.00E+0-1.36E-2
Global warming potential - land use and land use change(GWP-luluc)kg CO2 eq.9.85E-3NDNDNDNDNDNDNDNDND4.03E-54.91E-32.19E-40.00E+0-1.99E-7
Depletion potential of the stratospheric ozone layer(ODP)kg CFC-11 eq.4.26E-6NDNDNDNDNDNDNDNDND6.13E-93.44E-79.22E-80.00E+0-1.05E-1
Acidification potential, accumulated exceedance(AP)mol H+ eq.1.88E-1NDNDNDNDNDNDNDNDND3.56E-34.78E-21.23E-20.00E+0-4.38E-3
Eutrophication potential - freshwater(EP-freshwater)kg P eq.3.77E-3NDNDNDNDNDNDNDNDND1.28E-51.06E-36.17E-40.00E+0-3.15E-2
Eutrophication potential - marine(EP-marine)kg N eq.4.32E-2NDNDNDNDNDNDNDNDND1.67E-31.67E-24.71E-30.00E+0-3.59E-1
Eutrophication potential - terrestrial(EP-terrestrial)mol N eq.4.55E-1NDNDNDNDNDNDNDNDND1.82E-21.81E-15.01E-20.00E+0-1.09E-1
Photochemical ozone creation potential(POCP)kg NMVOC eq.4.26E-1NDNDNDNDNDNDNDNDND5.47E-37.56E-21.57E-20.00E+0-9.26E-5
Abiotic depletion potential - non-fossil resources(ADPE)kg Sb eq.4.17E-5NDNDNDNDNDNDNDNDND1.48E-75.30E-59.38E-70.00E+0-2.32E+2
Abiotic depletion potential - fossil resources(ADPF)MJ, net calorific value2.43E+3NDNDNDNDNDNDNDNDND5.17E+02.15E+22.93E+10.00E+0-1.54E+1
Water (user) deprivation potential(WDP)m3 world eq. deprived2.92E+1NDNDNDNDNDNDNDNDND1.30E-21.12E+01.09E-10.00E+0-1.41E+1
Global warming potential(GWP-GHG)kg CO2 eq.4.65E+1NDNDNDNDNDNDNDNDND3.99E-11.52E+12.14E+00.00E+0-1.78E+1
Particulate matter emissions(PM)Disease incidence2.26E-6NDNDNDNDNDNDNDNDND1.02E-71.22E-62.74E-70.00E+0-1.04E+0
Ionizing radiation, human health(IRP)kBq U235 eq.6.73E-1NDNDNDNDNDNDNDNDND2.16E-32.46E-19.81E-30.00E+0-5.84E+1
Eco-toxicity - freshwater(ETP-fw)CTUe1.22E+2NDNDNDNDNDNDNDNDND5.25E-13.18E+12.81E+00.00E+0-6.09E-9
Human toxicity, cancer effect(HTP-c)CTUh1.12E-8NDNDNDNDNDNDNDNDND3.83E-112.49E-92.84E-100.00E+0-1.50E-7
Human toxicity, non-cancer effects(HTP-nc)CTUh2.83E-7NDNDNDNDNDNDNDNDND6.82E-101.31E-77.12E-90.00E+0-1.80E+2
Land use related impacts/Soil quality(SQP)dimensionless1.61E+2NDNDNDNDNDNDNDNDND3.58E-11.28E+21.01E+10.00E+0-1.80E+2
Use of renewable primary energy as energy carrier(PERE)MJ, net calorific value1.63E+1NDNDNDNDNDNDNDNDND3.24E-23.54E+03.74E+00.00E+00.00E+0
Use of renewable primary energy resources used as raw materials(PERM)MJ, net calorific value1.82E-4NDNDNDNDNDNDNDNDND0.00E+00.00E+00.00E+00.00E+0-1.41E+1
Total use of renewable primary energy(PERT)MJ, net calorific value1.63E+1NDNDNDNDNDNDNDNDND3.24E-23.54E+03.74E+00.00E+0-2.32E+2
Use of non renewable primary energy as energy carrier(PENRE)MJ, net calorific value2.43E+3NDNDNDNDNDNDNDNDND5.17E+02.15E+22.93E+10.00E+00.00E+0
Use of non renewable primary energy resources used as raw materials(PENRM)MJ, net calorific value1.82E-4NDNDNDNDNDNDNDNDND0.00E+00.00E+00.00E+00.00E+0-2.32E+2
Total use of non renewable primary energy resource(PENRT)MJ, net calorific value2.43E+3NDNDNDNDNDNDNDNDND5.17E+02.15E+22.93E+10.00E+0-4.74E-1
Use of secondary material(SM)kg4.85E-1NDNDNDNDNDNDNDNDND2.94E-32.08E-11.20E-20.00E+0-1.27E-1
Use of renewable secondary fuels(RSF)MJ, net calorific value1.27E-1NDNDNDNDNDNDNDNDND2.99E-44.87E-21.87E-30.00E+00.00E+0
Use of non-renewable secondary fuels(NRSF)MJ, net calorific value4.91E-4NDNDNDNDNDNDNDNDND0.00E+00.00E+00.00E+00.00E+0-3.56E-1
Net use of fresh water(FW)m36.68E-1NDNDNDNDNDNDNDNDND3.11E-42.54E-22.44E-30.00E+0-3.50E+0
Hazardous waste disposed(HWD)kg2.23E+0NDNDNDNDNDNDNDNDND1.68E-21.31E+06.92E-20.00E+0-3.13E+1
Non-hazardous waste disposed(NHWD)kg2.30E+1NDNDNDNDNDNDNDNDND8.38E-21.73E+13.15E+00.00E+0-2.52E-4
Radioactive waste disposed(RWD)kg1.54E-4NDNDNDNDNDNDNDNDND5.08E-75.94E-52.27E-60.00E+00.00E+0
Components for re-use(CRU)kg0.00E+0NDNDNDNDNDNDNDNDND0.00E+00.00E+00.00E+00.00E+00.00E+0
Materials for recycling(MFR)kg4.55E-1NDNDNDNDNDNDNDNDND2.50E-31.92E-11.12E-20.00E+0-1.21E-1
Materials for energy recovery(MER)kg0.00E+0NDNDNDNDNDNDNDNDND0.00E+00.00E+00.00E+00.00E+0-4.04E-1
Exported electrical energy(EEE)MJ, net calorific value9.55E-2NDNDNDNDNDNDNDNDND2.41E-43.98E-21.21E-30.00E+0-3.56E-2
Exported thermal energy(EET)MJ, net calorific value4.58E-2NDNDNDNDNDNDNDNDND1.15E-45.04E-28.28E-40.00E+0-1.72E-6
AcronymsThe same acronyms apply as in the main scenario.
DisclaimersThe same disclaimers apply as in the main scenario.
General disclaimerThe results of the end-of-life stage (modules C1-C4) should be considered when using the results of the product stage (modules A1-A3/A1-A5 for services).

Results for additional scenarios for modules A4-C4

Additional scenario100% Re-Use
Description of the scenario/methodThe additional scenario assumes that 100% of the asphalt pavement is directed to reuse in new asphalt mixtures, instead of the mixed end-of-life distribution considered in the main scenario (73% reuse, 24% recycling and 3% landfill). The results are calculated using the same collection, transport and recovery process assumptions as the main scenario, with the end-of-life flows adjusted to reflect 100% reuse.
Results for additional scenarios for modules A4-C4
Impact categoryIndicatorUnitA1-A3A4A5B1B2B3B4B5B6B7C1C2C3C4D
Global warming potential - total(GWP-total)kg CO2 eq.4.65E+1NDNDNDNDNDNDNDNDND3.99E-11.52E+12.13E+00.00E+0-2.93E+1
Global warming potential - fossil fuels(GWP-fossil)kg CO2 eq.4.65E+1NDNDNDNDNDNDNDNDND3.99E-11.52E+12.13E+00.00E+0-2.93E+1
Global warming potential - biogenic(GWP-biogenic)kg CO2 eq.1.27E-2NDNDNDNDNDNDNDNDND4.34E-53.09E-39.42E-50.00E+0-3.24E-2
Global warming potential - land use and land use change(GWP-luluc)kg CO2 eq.9.85E-3NDNDNDNDNDNDNDNDND4.03E-54.91E-32.19E-40.00E+0-1.54E-2
Depletion potential of the stratospheric ozone layer(ODP)kg CFC-11 eq.4.26E-6NDNDNDNDNDNDNDNDND6.13E-93.44E-79.22E-80.00E+0-1.44E-6
Acidification potential, accumulated exceedance(AP)mol H+ eq.1.88E-1NDNDNDNDNDNDNDNDND3.56E-34.78E-21.23E-20.00E+0-1.49E-1
Eutrophication potential - freshwater(EP-freshwater)kg P eq.3.77E-3NDNDNDNDNDNDNDNDND1.28E-51.06E-36.17E-40.00E+0-4.78E-3
Eutrophication potential - marine(EP-marine)kg N eq.4.32E-2NDNDNDNDNDNDNDNDND1.67E-31.67E-24.71E-30.00E+0-3.95E-2
Eutrophication potential - terrestrial(EP-terrestrial)mol N eq.4.55E-1NDNDNDNDNDNDNDNDND1.82E-21.81E-15.01E-20.00E+0-4.41E-1
Photochemical ozone creation potential(POCP)kg NMVOC eq.4.26E-1NDNDNDNDNDNDNDNDND5.47E-37.56E-21.57E-20.00E+0-2.23E-1
Abiotic depletion potential - non-fossil resources(ADPE)kg Sb eq.4.17E-5NDNDNDNDNDNDNDNDND1.48E-75.30E-59.38E-70.00E+0-9.68E-5
Abiotic depletion potential - fossil resources(ADPF)MJ, net calorific value2.43E+3NDNDNDNDNDNDNDNDND5.17E+02.15E+22.93E+10.00E+0-9.52E+2
Water (user) deprivation potential(WDP)m3 world eq. deprived2.92E+1NDNDNDNDNDNDNDNDND1.30E-21.12E+01.09E-10.00E+0-1.59E+1
Global warming potential(GWP-GHG)kg CO2 eq.4.65E+1NDNDNDNDNDNDNDNDND3.99E-11.52E+12.14E+00.00E+0-2.93E+1
Particulate matter emissions(PM)Disease incidence2.26E-6NDNDNDNDNDNDNDNDND1.02E-71.22E-62.74E-70.00E+0-2.08E-6
Ionizing radiation, human health(IRP)kBq U235 eq.6.73E-1NDNDNDNDNDNDNDNDND2.16E-32.46E-19.81E-30.00E+0-1.18E+0
Eco-toxicity - freshwater(ETP-fw)CTUe1.22E+2NDNDNDNDNDNDNDNDND5.25E-13.18E+12.81E+00.00E+0-9.05E+1
Human toxicity, cancer effect(HTP-c)CTUh1.12E-8NDNDNDNDNDNDNDNDND3.83E-112.49E-92.84E-100.00E+0-7.56E-9
Human toxicity, non-cancer effects(HTP-nc)CTUh2.83E-7NDNDNDNDNDNDNDNDND6.82E-101.31E-77.12E-90.00E+0-2.05E-7
Land use related impacts/Soil quality(SQP)dimensionless1.61E+2NDNDNDNDNDNDNDNDND3.58E-11.28E+21.01E+10.00E+0-2.09E+2
Use of renewable primary energy as energy carrier(PERE)MJ, net calorific value1.63E+1NDNDNDNDNDNDNDNDND3.24E-23.54E+03.74E+00.00E+0-1.57E+1
Use of renewable primary energy resources used as raw materials(PERM)MJ, net calorific value1.82E-4NDNDNDNDNDNDNDNDND0.00E+00.00E+00.00E+00.00E+00.00E+0
Total use of renewable primary energy(PERT)MJ, net calorific value1.63E+1NDNDNDNDNDNDNDNDND3.24E-23.54E+03.74E+00.00E+0-1.57E+1
Use of non renewable primary energy as energy carrier(PENRE)MJ, net calorific value2.43E+3NDNDNDNDNDNDNDNDND5.17E+02.15E+22.93E+10.00E+0-9.52E+2
Use of non renewable primary energy resources used as raw materials(PENRM)MJ, net calorific value1.82E-4NDNDNDNDNDNDNDNDND0.00E+00.00E+00.00E+00.00E+00.00E+0
Total use of non renewable primary energy resource(PENRT)MJ, net calorific value2.43E+3NDNDNDNDNDNDNDNDND5.17E+02.15E+22.93E+10.00E+0-9.52E+2
Use of secondary material(SM)kg4.85E-1NDNDNDNDNDNDNDNDND2.94E-32.08E-11.20E-20.00E+0-5.79E-1
Use of renewable secondary fuels(RSF)MJ, net calorific value1.27E-1NDNDNDNDNDNDNDNDND2.99E-44.87E-21.87E-30.00E+0-1.57E-1
Use of non-renewable secondary fuels(NRSF)MJ, net calorific value4.91E-4NDNDNDNDNDNDNDNDND0.00E+00.00E+00.00E+00.00E+00.00E+0
Net use of fresh water(FW)m36.68E-1NDNDNDNDNDNDNDNDND3.11E-42.54E-22.44E-30.00E+0-3.63E-1
Hazardous waste disposed(HWD)kg2.23E+0NDNDNDNDNDNDNDNDND1.68E-21.31E+06.92E-20.00E+0-3.88E+0
Non-hazardous waste disposed(NHWD)kg2.30E+1NDNDNDNDNDNDNDNDND8.38E-21.73E+13.15E+00.00E+0-3.36E+1
Radioactive waste disposed(RWD)kg1.54E-4NDNDNDNDNDNDNDNDND5.08E-75.94E-52.27E-60.00E+0-2.82E-4
Components for re-use(CRU)kg0.00E+0NDNDNDNDNDNDNDNDND0.00E+00.00E+00.00E+00.00E+00.00E+0
Materials for recycling(MFR)kg4.55E-1NDNDNDNDNDNDNDNDND2.50E-31.92E-11.12E-20.00E+0-5.09E-1
Materials for energy recovery(MER)kg0.00E+0NDNDNDNDNDNDNDNDND0.00E+00.00E+00.00E+00.00E+00.00E+0
Exported electrical energy(EEE)MJ, net calorific value9.55E-2NDNDNDNDNDNDNDNDND2.41E-43.98E-21.21E-30.00E+0-1.42E-1
Exported thermal energy(EET)MJ, net calorific value4.58E-2NDNDNDNDNDNDNDNDND1.15E-45.04E-28.28E-40.00E+0-3.92E-2
AcronymsThe same acronyms apply as in the main scenario.
DisclaimersThe same disclaimers apply as in the main scenario.
General disclaimerThe results of the end-of-life stage (modules C1-C4) should be considered when using the results of the product stage (modules A1-A3/A1-A5 for services).

Results for additional scenarios for modules A4-C4

Additional scenario100% Landfilling
Description of the scenario/methodThe additional scenario assumes that 100% of the asphalt pavement is directed to landfill, instead of the mixed end-of-life distribution considered in the main scenario (73% reuse, 24% recycling and 3% landfill). The environmental results are calculated accordingly, considering the same collection and transport assumptions as the main scenario and disposal of the entire quantity in a landfill.
Results for additional scenarios for modules A4-C4
Impact categoryIndicatorUnitA1-A3A4A5B1B2B3B4B5B6B7C1C2C3C4D
Global warming potential - total(GWP-total)kg CO2 eq.4.65E+1NDNDNDNDNDNDNDNDND3.99E-11.52E+10.00E+01.73E+10.00E+0
Global warming potential - fossil fuels(GWP-fossil)kg CO2 eq.4.65E+1NDNDNDNDNDNDNDNDND3.99E-11.52E+10.00E+01.73E+10.00E+0
Global warming potential - biogenic(GWP-biogenic)kg CO2 eq.1.27E-2NDNDNDNDNDNDNDNDND4.34E-53.09E-30.00E+03.09E-20.00E+0
Global warming potential - land use and land use change(GWP-luluc)kg CO2 eq.9.85E-3NDNDNDNDNDNDNDNDND4.03E-54.91E-30.00E+06.99E-30.00E+0
Depletion potential of the stratospheric ozone layer(ODP)kg CFC-11 eq.4.26E-6NDNDNDNDNDNDNDNDND6.13E-93.44E-70.00E+03.06E-70.00E+0
Acidification potential, accumulated exceedance(AP)mol H+ eq.1.88E-1NDNDNDNDNDNDNDNDND3.56E-34.78E-20.00E+08.41E-20.00E+0
Eutrophication potential - freshwater(EP-freshwater)kg P eq.3.77E-3NDNDNDNDNDNDNDNDND1.28E-51.06E-30.00E+01.20E-30.00E+0
Eutrophication potential - marine(EP-marine)kg N eq.4.32E-2NDNDNDNDNDNDNDNDND1.67E-31.67E-20.00E+01.20E-10.00E+0
Eutrophication potential - terrestrial(EP-terrestrial)mol N eq.4.55E-1NDNDNDNDNDNDNDNDND1.82E-21.81E-10.00E+03.50E-10.00E+0
Photochemical ozone creation potential(POCP)kg NMVOC eq.4.26E-1NDNDNDNDNDNDNDNDND5.47E-37.56E-20.00E+01.22E-10.00E+0
Abiotic depletion potential - non-fossil resources(ADPE)kg Sb eq.4.17E-5NDNDNDNDNDNDNDNDND1.48E-75.30E-50.00E+02.21E-50.00E+0
Abiotic depletion potential - fossil resources(ADPF)MJ, net calorific value2.43E+3NDNDNDNDNDNDNDNDND5.17E+02.15E+20.00E+02.53E+20.00E+0
Water (user) deprivation potential(WDP)m3 world eq. deprived2.92E+1NDNDNDNDNDNDNDNDND1.30E-21.12E+00.00E+01.08E+10.00E+0
Global warming potential(GWP-GHG)kg CO2 eq.4.65E+1NDNDNDNDNDNDNDNDND3.99E-11.52E+10.00E+01.73E+10.00E+0
Particulate matter emissions(PM)Disease incidence2.26E-6NDNDNDNDNDNDNDNDND1.02E-71.22E-60.00E+01.93E-60.00E+0
Ionizing radiation, human health(IRP)kBq U235 eq.6.73E-1NDNDNDNDNDNDNDNDND2.16E-32.46E-10.00E+01.96E-10.00E+0
Eco-toxicity - freshwater(ETP-fw)CTUe1.22E+2NDNDNDNDNDNDNDNDND5.25E-13.18E+10.00E+04.19E+10.00E+0
Human toxicity, cancer effect(HTP-c)CTUh1.12E-8NDNDNDNDNDNDNDNDND3.83E-112.49E-90.00E+02.31E-90.00E+0
Human toxicity, non-cancer effects(HTP-nc)CTUh2.83E-7NDNDNDNDNDNDNDNDND6.82E-101.31E-70.00E+06.08E-80.00E+0
Land use related impacts/Soil quality(SQP)dimensionless1.61E+2NDNDNDNDNDNDNDNDND3.58E-11.28E+20.00E+05.78E+20.00E+0
Use of renewable primary energy as energy carrier(PERE)MJ, net calorific value1.63E+1NDNDNDNDNDNDNDNDND3.24E-23.54E+00.00E+03.35E+00.00E+0
Use of renewable primary energy resources used as raw materials(PERM)MJ, net calorific value1.82E-4NDNDNDNDNDNDNDNDND0.00E+00.00E+00.00E+00.00E+00.00E+0
Total use of renewable primary energy(PERT)MJ, net calorific value1.63E+1NDNDNDNDNDNDNDNDND3.24E-23.54E+00.00E+03.35E+00.00E+0
Use of non renewable primary energy as energy carrier(PENRE)MJ, net calorific value2.43E+3NDNDNDNDNDNDNDNDND5.17E+02.15E+20.00E+02.53E+20.00E+0
Use of non renewable primary energy resources used as raw materials(PENRM)MJ, net calorific value1.82E-4NDNDNDNDNDNDNDNDND0.00E+00.00E+00.00E+00.00E+00.00E+0
Total use of non renewable primary energy resource(PENRT)MJ, net calorific value2.43E+3NDNDNDNDNDNDNDNDND5.17E+02.15E+20.00E+02.53E+20.00E+0
Use of secondary material(SM)kg4.85E-1NDNDNDNDNDNDNDNDND2.94E-32.08E-10.00E+01.70E-10.00E+0
Use of renewable secondary fuels(RSF)MJ, net calorific value1.27E-1NDNDNDNDNDNDNDNDND2.99E-44.87E-20.00E+02.33E-20.00E+0
Use of non-renewable secondary fuels(NRSF)MJ, net calorific value4.91E-4NDNDNDNDNDNDNDNDND0.00E+00.00E+00.00E+00.00E+00.00E+0
Net use of fresh water(FW)m36.68E-1NDNDNDNDNDNDNDNDND3.11E-42.54E-20.00E+0-3.70E+00.00E+0
Hazardous waste disposed(HWD)kg2.23E+0NDNDNDNDNDNDNDNDND1.68E-21.31E+00.00E+01.30E+00.00E+0
Non-hazardous waste disposed(NHWD)kg2.30E+1NDNDNDNDNDNDNDNDND8.38E-21.73E+10.00E+02.65E+30.00E+0
Radioactive waste disposed(RWD)kg1.54E-4NDNDNDNDNDNDNDNDND5.08E-75.94E-50.00E+04.66E-50.00E+0
Components for re-use(CRU)kg0.00E+0NDNDNDNDNDNDNDNDND0.00E+00.00E+00.00E+00.00E+00.00E+0
Materials for recycling(MFR)kg4.55E-1NDNDNDNDNDNDNDNDND2.50E-31.92E-10.00E+01.23E-10.00E+0
Materials for energy recovery(MER)kg0.00E+0NDNDNDNDNDNDNDNDND0.00E+00.00E+00.00E+00.00E+00.00E+0
Exported electrical energy(EEE)MJ, net calorific value9.55E-2NDNDNDNDNDNDNDNDND2.41E-43.98E-20.00E+07.02E-20.00E+0
Exported thermal energy(EET)MJ, net calorific value4.58E-2NDNDNDNDNDNDNDNDND1.15E-45.04E-20.00E+02.89E-20.00E+0
AcronymsThe same acronyms apply as in the main scenario.
DisclaimersThe same disclaimers apply as in the main scenario.
General disclaimerThe results of the end-of-life stage (modules C1-C4) should be considered when using the results of the product stage (modules A1-A3/A1-A5 for services).
Description of how the averages have been determinedThe average values have been determined based on the production quantities of each asphalt mixture type recorded during the reference year 2025. The average results have been weighted according to the respective production volumes (in tonnes), ensuring that each product type contributes proportionally to the total annual production. The weighted averages therefore reflect the actual production mix of the manufacturing plant during 2025.

Abbreviations

Not applicable

References

General Programme Instructions of the International EPD® System. Version 5.1.0

PCR 2019:14 Construction products v.2.0.1

EN 15804:2012+A2:2019/AC:2021, Sustainability of construction works — Environmental Product Declarations -

Core rules for the product category of construction products

Residual Energy Mix 2025 from Renewable Energy Sources Operator & Guarantees of Origin DAPEEP SA

ISO 14020:2000, Environmental labels and declarations - General principles

ISO 14040:2006, Environmental management - Life cycle assessment - Principles and framework

ISO 14044:2006 Environmental management — Life cycle assessment — Requirements and guidelines

ISO 14025:2006 Environmental labels and declarations - Type III environmental declarations - Principles and

procedures

ISO 14025:2026 Environmental statements and programmes for products — Environmental product declarations (EPDs)

EN 15941:2024 Sustainability of construction works - Data quality for environmental assessment of products and construction work - Selection and use of data

Version history

Version 001, 2026-11-23

Original version of the EPD